
Indonesian President Joko Widodo visits the Big Leap complex
The construction project requires the application of advanced technology and standards in design, in detailing/ shop drawings as well as high precision in fabrication and erection to bring great success to the whole project. As the result, all the pre-engineered steel buildings come on-line in 2015 with the highest building of 60m and a total weight of 7,000MT.